It is impossible to pass VMware 2VB-602 exam without any help in the short term. Come to Passleader soon and find the most advanced, correct and guaranteed VMware 2VB-602 practice questions. You will get a surprising result by our Up to the immediate present VMware Specialist - vRealize Operations 6.x Exam practice guides.
2026 New 2VB-602 Exam Dumps with PDF and VCE Free: https://www.2passeasy.com/dumps/2VB-602/
P.S. Top Quality 2VB-602 questions pool are available on Google Drive, GET MORE: https://drive.google.com/open?id=1oJbmpKZLsB-05in8tSKhVQKbYEcnrhzH
New VMware 2VB-602 Exam Dumps Collection (Question 1 - Question 10)
Question No: 1
Endpoint Operations agent plug-ins for application monitoring (such as MS SQL, IIS, Apache) are included with which vRealize Operations licensing? (Choose the best answer.)
A. vRealize Operations Enterprise
B. vRealize Operations Standard
C. vSphere with Operations Manager
D. vRealize Operations Advanced
Answer: C
Explanation: Reference:
http://vxpresss.blogspot.com/2021/03/using-end-point-operations-agent-with.html
Question No: 2
When installing and configuring vRealize Operations clusters, what are three requirements for creating a node? (Choose three.)
A. In the analytics cluster, CPU, memory and disk size must be identical for all nodes
B. In the analytics cluster, nodes may be different kinds of deployment: vApp or Linux
C. In the analytics cluster, CPU, memory and disk size must NOT be identical for all nodes
D. All nodes must run the same vRealize Operations Manager version
E. Remote collector nodes may be of different sizes from each other or from the uniform analytics cluster node size
Answer: ABD
Explanation:
Reference:
https://www.vmware.com/content/dam/digitalmarketing/vmware/en/pdf/products/vsphere/vmware-vrealize-oper
Question No: 3
View the Exhibit.
Based on the exhibit, which of the below is true about the visibility of this dashboard? (Choose the best answer.)
A. This dashboard will be visible to vRealize Operations administrators
B. This dashboard will be visible to the user groups to which it has been shared
C. This dashboard will NOT be visible to any user
D. This dashboard will be visible to any user allowed to see NSX objects
Answer: C
Explanation:
Reference: https://communities.vmware.com/thread/505687
Question No: 4
Which is a valid use case for building a Project? (Choose the best answer.)
A. To simulate the additional projected costs needed for new hosts
B. To simulate adding new hosts to a cluster and at the same time coming up with the projected costs for this new hardware
C. To examine vSphere compliance
D. To simulate adding new hosts to a cluster
Answer: D
Question No: 5
View the Exhibit
In the widget Reference:d in the exhibit, how would a user find available dashboard transitions? (Choose the best answer.)
A. Right-click this selected object:
B. Click this icon:
C. Click this icon:
D. Click this icon:
Answer: D
Explanation:
Reference: https://communities.vmware.com/thread/451536
Question No: 6
As of vRealize Operations (vROps) version 6.1, remote collectors can be configured into collector groups. Why is this significant? (Choose the best answer.)
A. If the collecting node fails, another node in the collecting group can take over and resume collection
B. The more nodes in a collection group, the more collected metric data can be buffered and stored in the case of a network outage
C. Configuring a collector group, the nodes can be configured in an active-active mode which will allow for faster and increased capacity collections
D. Remote collectors of different vROps versions can be run in a collector group
Answer: D
Question No: 7
What is required for configuring the autoswitch of dashboards? (Choose the best answer.)
A. Enabling all dashboards for auto transition, which will then transition all every five minutes, in the order dashboards were first opened
B. No action; dashboards will automatically switch through all open tabs, with one transition every five minutes
C. Enabling specific dashboards for auto transition, selecting the switch time interval from one dashboard to the next, and determining the transition order of the enabled dashboards
D. Deleting dashboards from the autoswitch configuration that should NOT be in the transitions, selecting the switch time interval from one dashboard to the next, and determining the transition order of the remaining dashboards
Answer: A
Question No: 8
What are three actions that are managed in the Policies section of vRealize Operations? (Choose three.)
A. Modify the CPU demand value in a custom profile
B. Modify the level above which the Faults badge will be read
C. Determine which resources are included in workload calculations
D. Set the virtual CPU to physical CPU overcommit ratio to use in capacity calculations
E. Enable the calculation of capacity metrics and badges
Answer: CDE
Question No: 9
A rebalance plan from the Rebalance Container action includes which three pieces of information? (Choose three.)
A. Destination cluster
B. Applications impacted
C. Time the virtual machine was last moved
D. Reason for move
E. Virtual machines to be moved
Answer: ADE
Explanation:
Reference:
https://docs.vmware.com/en/vRealize-Operations-Manager/6.5/com.vmware.vcom.core.doc/GUID-92F9F9E0-2
Question No: 10
After running the Rebalance Container action, where can a user view the status and verify all of the virtual machines were moved? (Choose the best answer.)
A. Recent Tasks
B. Home Screen
C. Alerts tab
D. Workload Utilization dashboard
Answer: A
Explanation:
Reference:
https://pubs.vmware.com/vrealizeoperationsmanager-62/index.jsp?topic=%2Fcom.vmware.vcom.core.doc%2FG
100% Up to the immediate present VMware 2VB-602 Questions & Answers shared by Allfreedumps, Get HERE: https://www.allfreedumps.com/2VB-602-dumps.html (New Q&As)