Your success in Cisco 650-127 is our sole target and we develop all our 650-127 braindumps in a way that facilitates the attainment of this target. Not only is our 650-127 study material the best you can find, it is also the most detailed and the most updated. 650-127 Practice Exams for Cisco Cisco Additional 650-127 are written to the highest standards of technical accuracy.
2026 New 650-127 Exam Dumps with PDF and VCE Free: https://www.2passeasy.com/dumps/650-127/
Q1. Which product(s) are included in the first Cisco Smart Grid product offerings?
A. all existing Cisco products
B. Cisco Smart Grid 3000 ruggedized switching platform
C. Cisco Connected Grid Router 2010 and Connected Grid Switch 2520
D. ISR 2900 series and Catalyst 2960
Answer: C
Q2. Which two data flows are used with Substation Automation with GOOSE?
A. IED RTU and IED MU
B. IED IED and IED RTU
C. IEDMU and IED IED
D. IED HMI and IED IED
Answer: A
Q3. Which feature is supported by Cisco License Manager3.0?
A. no role-based access
B. ability to handle up to 500,000 devices
C. free test license
D. PDI helpdesk
Answer: B
Q4. By 2015, how big is the Smart Grid market estimated to be (Pike Research estimate}?
A. 500 Billion Dollars
B. 200 Billion Dollars
C. 400 Billion Dollars
D. 300 Billion Dollars
E. 100 Billion Dollars
Answer: B
Explanation: The answer to this question can be find in the Cisco Training material, module 1, second slide, available through the Partner education connection.
Q5. How many types of licenses are available for the Cisco CGR 2010?
A. 5 licenses
B. 4 licenses
C. 3 licenses
D. 2 licenses
Answer: B
Q6. Which statement is correct?
A. Cisco CGS 2520 switches support advanced QOS functionality for proper handling of all station bus traffic.
B. Cisco CGS 2520 switches do not support any QoS function.
C. Cisco CGS 2520 switches support advanced QoS functionality for proper handling of all traffic.
D. Cisco CGS 2520 switches support advanced QoS functionality for proper handling of SCADA traffic.
Answer: D
Q7. What is the correct warranty coverage on Cisco Connected Grid products?
A. 90 days
B. 5 years
C. 1 years
D. 3 years
E. 10 years
Answer: B
Q8. What is the total support wattage on CGS-2520-16S-8PC on PoE when two power supplies are installed?
A. 170 W
B. 65 W
C. 20 W
D. 210 W
Answer: A
Q9. What is Cisco's overall vision in the Smart Grid market?
A. To design and architect governmental policies which can be integrated into the power grid.
B. To design and architect Intelligent Electronic Devices which can be integrated into the power grid.
C. To design and architect end-to-end solutions which can be integrated into the power grid.
D. To design and architect point products which can be integrated into the power grid.
E. To design and architect video cameras, which can be integrated into the power grid.
Answer: A
Q10. What is Cisco's overall vision with respect to communications protocols?
A. To design and architect end-to-end communications infrastructure using confusing communication protocols.
B. To design and architect end-to-end communications infrastructure using foreign communication protocols.
C. To design and architect end-to-end communications infrastructure using open standard communication protocols.
D. To design and architect end-to-end communications infrastructure using proprietary communication protocols.
Answer: C