Proper study guides for Improve Microsoft Software Testing with Visual Studio 2012 certified begins with Microsoft 70-497 preparation products which designed to deliver the High quality 70-497 questions by making you pass the 70-497 test at your first time. Try the free 70-497 demo right now.
2026 New 70-497 Exam Dumps with PDF and VCE Free: https://www.2passeasy.com/dumps/70-497/
Q1. You use Microsoft Test Manager (MTM) to conduct a manual test for an ASP.NET web application. You have created a test plan named Release 2.0.
The test plan needs to meet the following requirements:
You need to configure the Release 2.0 test plan by creating new test settings for the requirements and assigning the test settings to the test plan.
How should you configure the new test settings?
A. On the Data and Diagnostics page, select the Event Log and System Information options.
B. On the Data and Diagnostics page, select the Event Log, ASP.NET Client Proxy for IntelliTrace and Test Impact, and IntelliTrace options.
C. On the Data and Diagnostics page, select the Event Log and IntelliTrace options.
D. On the Data and Diagnostics page, select the Event Log and ASP.NET Client Proxy for IntelliTrace and Test Impact options.
Answer: B
Q2. You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template.
Your client has added new capabilities to a product in development, which necessitates a major change to existing test cases. The produc owner has created a new product backlog item (PBI) and has provided you a link to a document that explains these new requirements.
You need to provide easy access to the requirements document from the test cases.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. From the Test Suite window, add the requirement document by using Add Requirements.
B. From the Links tab, link the requirements document to the PBI.
C. From the Test Plan Manager, add a link to the PBI.
D. For each test case, use the Tested Backlog Items tab to add a link to the PBI.
Answer: BD
Q3. You are using Microsoft Visual Studio 2012 to manage test environments for your company.
You need to set up a two-computer environment for running tests. The environment needs to include:
The server computer has already been created using Microsoft System Center Virtual Machine Manager (SCVMM).
You need to create a lab environment for testing this configuration.
What should you do?
A. Install a physical machine with the client configuration. Connect both the client and the existing SCVMM server computers with Visual Studio 2012 through the Server Explorer window.
B. Install and configure a virtual machine with the client configuration by using Hyper-V. Connect both the client and the existing SCVMM server computers with Visual Studio 2012 through the Team Explorer window.
C. Install a physical machine with the client configuration. Create a new SCVMM lab environment by combining both the client and the existing SCVMM server computers by using Lab Center in Microsoft Test Manager (MTM) 2012.
D. Install a physical machine with the client configuration. Create a new standard environment, combining the client and the server machines by using Lab Center in Microsoft Test Manager (MTM) 2012.
Answer: D
Q4. You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. Your TFS environment includes SharePoint Server 2010 Enterprise Edition and reporting integration.
You need to identify the number of bugs that are open and assigned to you.
What should you do?
A. Open the Track tab in MTM and click the My Assigned Bugs link.
B. Open the Bugs Dashboard and view the Bug Progress report.
C. Open a Visual Studio 2012 Command prompt and run the ActiveBugList.exe command, pasting in username as a parameter.
D. Open the Bugs Dashboard and view the Active Bugs by Assignment report.
Answer: D
Q5. You are using Microsoft Test Manager (MTM) to create a test plan for testing an ASP.NET website.
Your test plan needs to validate a set of critical business functionalities for the current sprint. All business functionalities are documented in the requirements document published to the project portal.
You need to associate your test plan with the requirements document.
What should you do?
A. Add a link to the requirements document in the Links section of the Properties view of the test plan.
B. Click Copy Link in the Properties view of the test plan to link the requirements document on the project portal to the test plan.
C. In the Area path drop-down list in the Properties view of the test plan, right-click the test plan area path node relevant to the requirements being tested. Select Add link to associate the requirements document link on the project portal with the area path node.
D. Click Link next to the Description box in the Properties view of the test plan to link the requirements document on the project portal to the test plan.
E. Click Link next to the Name box in the Properties view of the test plan to link the requirements document on the project portal to the test plan.
Answer: A
Q6. You are using Microsoft Test Manager (MTM).
You have test cases that use a shared steps work item. You plan to replace the shared steps work item with a new implementation.
You need to find the test cases that are using that shared steps work item.
What are two possible features you could use to achieve this goal? (Choose two. Each answer choice provides a complete solution.)
A. A Direct Links query
B. Shared Steps Manager
C. The TCM.exe utility
D. The WitAdmin.exe utility
Answer: AB
Q7. You are using Microsoft Test Manager (MTM).
An application that you are responsible for testing has been modified to include a new data entry field. This new field requires testing against a set of known test data.
You need to modify the manual test case to include input and validation data for the new data entry field to meet these requirements. Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)
A. Create a new test case for each data value to be tested.
B. Insert a test stepinsert a parameter into its action column to represent the input data value.
C. Insert a test stepinsert a parameter into its Expected Results column to represent the expected result.
D. Insert the actionexpected results values to the Parameter Values list pane.
E. Insert a test step for each new result data value to be tested.
Answer: BDE
Q8. You are using Microsoft Test Manager (MTM). You have developed a new test case.
You need to:
What should you do?
A. Open the Test Configuration Manager view and change the area path, priority, and state.
B. Open the Test Plan Manager view and change the area path, priority, and state.
C. Open the test case work item and change the area path, priority, and state.
D. Open the test plan Properties view and change the area path, priority, and state.
Answer: C
Q9. While reviewing a bug in Microsoft Test Manager (MTM), you realize there is no test case covering the bug.
You need to create a test case from the bug, including test steps, and associate it with the test case for future reference.
What should you do?
A. In MTM, in the Verify Bugs activity, select the bug. Click Open test case.
B. Open a Visual Studio 2012 window. Select the bug and click Open test case.
C. In MTM, in the Verify Bugs activity, select the bug. Click Create test case from bug.
D. Open a Visual Studio 2012 window. Create a test case and associate it with the bug.
Answer: C
Q10. You are using Microsoft Test Manager (MTM). You are supporting a set of different configurations for your product.
You plan to prepare the test plan by assigning the tester for each test case.
You need to configure the test plan to support this requirement.
What should you do?
A. Assign the tester to each combination of test case and configuration.
B. In the Assigned to field for each test case and configuration, select Tester.
C. Assign the tester as the configuration owner for each configuration.
D. Assign the tester to each combination of test suite and configuration.
Answer: A