NEW QUESTION 1
When an Agile project team receives an “emergency request” during an iteration, which is the best first step that the Agile project manager should take?
- A. Stop work on unfinished user stories and work on the urgent request.
- B. Call a team meeting and change the iteration scope to include the request.
- C. Provide the customer with options provided by the project team.
- D. Explain that the team cannot do the added work until the next iteration.
Answer: C
NEW QUESTION 2
The purpose of the iteration retrospective is to:
- A. Report progress of the work effort, what work will be done next, and review impediments to progress.
- B. Prioritize the Product Backlog, generate development and testing estimates, and plan the next iteration.
- C. Provide a demonstration of the features developed during the iteration, get feedback from users, and begin testing.
- D. Identify what worked well, what did not work well, and what actions should be taken to improve the process.
Answer: D
NEW QUESTION 3
Which of the following best represents both a principle of the Agile manifesto and a Lean method of simplicity?
- A. Maximizing the amount of work not done
- B. Delivering early and continuously
- C. Welcoming changing requirements
- D. Deciding at the last responsible moment
Answer: A
NEW QUESTION 4
What are the primary outputs of a release planning session?
- A. Release vision, assumptions, action items, and iteration goals
- B. Prioritized Product Backlog, risks, action items, and release goals
- C. Estimated iteration velocities, risks, action items, and Release Backlog
- D. Risks, action items, dependencies, and Release Backlog
Answer: D
NEW QUESTION 5
The advantage of face-to-face collaboration emphasized in eXtreme Programming (XP) is that it:
- A. allows team members to use common language in their design and code.
- B. delays feedback much more than scheduled inspections.
- C. eliminates communication delays and misunderstandings.
- D. allows team members to correct some mistakes on the fly.
Answer: C
NEW QUESTION 6
On a particular project, product quality is being measured at regular intervals and is consistently below the acceptable level. In a Lean environment, how should this problem be addressed?
- A. The team should implement more rigorous testing at the end of each development cycle.
- B. Management should direct the team on specific actions that they should take to improve quality.
- C. Management should guide the team as it seeks to improve itself and reduce errors in the system.
- D. The Project Champion should review the acceptable quality threshold to ensure that it is realistic.
Answer: C
NEW QUESTION 7
In a Lean Software Development environment, the Project Leader strives to eliminate:
- A. Work in Process (WIP) and bugs.
- B. Delays and building what is not needed.
- C. Defects and features with low value stream values.
- D. Poor requirements and changing scope.
Answer: C
NEW QUESTION 8
The best approach to estimate the work on a project when using story points is to have:
- A. Team members assign estimates by averaging Planning Poker cards.
- B. The most senior team member prepare the estimates.
- C. Two or three senior team members estimate and take the average of their times.
- D. The team work together to agree on estimates in a group setting.
Answer: D
NEW QUESTION 9
For a "caves and commonroom arrangement, the most appropriate prerequisite is that the people in the room must be working on:
- A. Whatever they choose.
- B. Individual projects.
- C. The same set of multiple projects,
- D. The same project.
Answer: D
NEW QUESTION 10
At a strategic level, what is the most appropriate way for an Agile team to estimate a project?
- A. Creating a strategic plan by estimating hours and days required
- B. Using an abstract measurement to estimate Product Backlog items
- C. Estimating source lines of code needed to implement the features
- D. Taking an initial set of estimates and adding an appropriate risk factor
Answer: B
NEW QUESTION 11
In an Agile approach, at which meeting does a team examine the effectiveness of risk responses by conducting a risk audit?
- A. Release planning
- B. Sprint planning
- C. Sprint Retrospective
- D. Daily Scrum
Answer: C
NEW QUESTION 12
Continuous integration ensures that a product is:
- A. Ready to ship when all features are complete.
- B. Delivered for testing at the end of each day.
- C. Technologically ready to deploy at any time.
- D. Deployed after final business approvals.
Answer: C
NEW QUESTION 13
eXtreme Programming (XP) teams strive to avoid:
- A. Incremental design and architecture.
- B. Pair programming.
- C. Manual regression testing.
- D. Test-Driven Development (TDD).
Answer: C
NEW QUESTION 14
The Kaizen philosophy is change:
- A. For the better.
- B. Driven by process improvement.
- C. Driven by teams.
- D. Forsmallgroups.
Answer: D
NEW QUESTION 15
The term ¡°last responsible moment¡± refers to the moment at which:
- A. the iteration testing deadline arrives and code testing must stop.
- B. failing to make a decision eliminates an important alternative.
- C. release planning is complete and the first iteration planning starts.
- D. the implementation date is set and sponsor approval has been received.
Answer: B
NEW QUESTION 16
During which activity is the sequence of numbers 0, 1, 2, 3, 5, 8, 13 often used?
- A. Denoting development sequence
- B. Estimating development hours
- C. Indicating priority of a story
- D. Estimating points of a story
Answer: C
NEW QUESTION 17
An Agile team best ensures product quality through:
- A. The development team’s use of pair programming.
- B. Quality assurance’s daily collaboration with the development team.
- C. More frequent inspection after each iteration.
- D. Feedback gathered during iteration retrospectives.
Answer: C