Exambible 200-150 Questions are updated and all 200-150 answers are verified by experts. Once you have completely prepared with our 200-150 exam prep kits you will be ready for the real 200-150 exam without a problem. We have Rebirth Cisco 200-150 dumps study guide. PASSED 200-150 First attempt! Here What I Did.


2026 New 200-150 Exam Dumps with PDF and VCE Free: https://www.2passeasy.com/dumps/200-150/

Q1. Refer to the exhibit.

What type of network communication is depicted?

A. 802 3 frame

B. TCP packet

C. UDP packet

D. Ethernet frame

Answer: A

Q2. Which three terms are used to describe data at Layers 1, 2, and 4 of the OSI model? (Choose three.)

A. PDUs

B. Bits

C. Sequences

D. Segments

E. Packets

F. Frames

Answer: B,D,F

Explanation:

Bits -1 layer Frames - 2 layer Segments - 4 layer

http://en.wikipedia.org/wiki/OSI_model

Q3. What action does a switch take if the destination MAC address is unknown?

A. Discard frame

B. Send ICMP unreachable message to source

C. Flood packet on all ports

D. Compare destination IP address against an ACL to determine if it is permitted

E. Send gratuitous ARP on all ports and wait for reply before forwarding

Answer: C

Explanation:

"What happens though when the switch receives a frame with a destination MAC address that is not included in the table? In that case the switch will just broadcast/flood the frame with the unknown destination address to all of its ports (apart from the port where the frame came from). This process is called unknown unicast flooding. " http://telconotes.wordpress.com/2013/03/09/how-a-switch-works/

Q4. Which two statements about configuring VLANs on the Cisco Nexus 7000 platform are true? (Choose two.)

A. Software updates are disruptive to VLANs.

B. VLANs with the same number are unique to their VDC.

C. VLAN licensing is required for use.

D. To change VLAN information, the administrator must be at the switch (config) # prompt.

E. The command copy running-config startup-config will save changes to the VLAN database.

Answer: B,E

Q5. Which option describes what a switch does after it items that a host has connected to a switch port?

A. Flood the frame only on all of its trunk ports.

B. Create a MAC to port mapping entry in MAC table.

C. Flood the frame only on all of its access ports.

D. Discard the frame.

Answer: B

Q6. Which two VTP modes allow the creation of local VLANs? (Choose two.)

A. transparent

B. native

C. server

D. client

E. on

Answer: A,C

Q7. Which VTP mode disallows the creation of local VLANs?

A. transparent

B. tunneling

C. server

D. client

E. off

F. native

Answer: D

Explanation:

"A VTP client behaves like a VTP server and transmits and receives VTP updates on its trunks, but you cannot create, change, or delete VLANs on a VTP client. VLANs are configured on another switch in the domain that is in server mode." http://www.cisco.com/en/US/docs/switches/lan/catalyst3560/software/release/12.2_52_se/configuration/guide/swvtp.html#wp1205076

Q8. Which two statements about configuring VLANs on the Cisco Nexus 7000 platform are true? (Choose two.)

A. Software updates are disruptive to VLANs.

B. VLANs with the same number are unique to their VDC.

C. VLAN licensing is required for use.

D. To change VLAN information, the administrator must be at the switch (config) # prompt.

E. The command copy running-config startup-config will save changes to the VLAN database.

Answer: B,E

Q9. What can you tell about server ports and their external Interfaces from the exhibits?

A. vfc3/1 is not correctly connected to server external interface fc2/1.

B. vfc3/1 is not correctly connected to server external Interface fc2/1 and flogi are unsuccessful.

C. Server interface vfc3/1 is assigned to NP uplinks fc2/1. fc2/2, fc2/3. and fc2/4. There are 4 successful flogi.

D. Server interface vfc3/1 is assigned to NP uplinks fc2/1, fc2/2, fc2/3, and fc2/4. There are 4 flogi are in initialization state.

Answer: C

Q10. An engineer is configuring a new MDS switch. The switch is powered on, the customer connects to the console, and the initial setup script is started.

Which two items can be configured during this setup process?

A. default port-channel mode

B. default port VSAN membership

C. default switch port interface state

D. default zone mode

E. default storage VDC

Answer: C,D