NEW QUESTION 1
A process can be defined as a repetitive and systematic series of steps or activities where inputs are modified or assembled to achieve a __________ result.
- A. Revenue total
- B. Month end
- C. Customer desired
- D. Budgeted
Answer: C
NEW QUESTION 2
Contingency Tables are used to perform which of these functions?
- A. Illustrate one-tail proportions
- B. Analyze the "what if" scenario
- C. Contrast the Outliers under the tail
- D. Compare more than two sample proportions with each other
Answer: D
NEW QUESTION 3
Which of the following is used to test the significance for the analysis of a Variance Table?
- A. t Test
- B. F Test
- C. Chi Square Test
- D. Acid Test
Answer: B
NEW QUESTION 4
As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.
- A. Kanban
- B. Kaizen
- C. Poke-Yoke
- D. WhoSai
Answer: A
NEW QUESTION 5
The difference between the largest observation and the smallest observation in the data set is known as the __________.
- A. Breadth
- B. Range
- C. Spread
- D. Median
Answer: B
NEW QUESTION 6
The reason(s) for not marking the customer Specification Limits (SL) on a Control Chart is which of these? (Note: There are 4 correct answers).
- A. Process control teams should not control a process based on SLs
- B. Displaying the SLs on a Control Chart sends a wrong signal toward process control
- C. Marking the SLs on a Control Chart is against the principle of charting
- D. By marking the SLs, one can confuse the operator as to what limits are critical
- E. By using mere Control Limits the process only needs to be in Statistical Control
Answer: ABDE
NEW QUESTION 7
Which statement(s) are correct for the Regression Analysis shown here? (Note: There are 2 correct answers).
- A. This Regression is an example of a Multiple Linear Regression.
- B. This Regression is an example of Cubic Regression.
- C. %Cu explains the majority of the process variance in heat flux.
- D. Thickness explains over 80% of the process variance in heat flux.
- E. The number of Residuals in this Regression Analysis is 26.
Answer: AD
NEW QUESTION 8
When it comes to Control one of the most effective means of eliminating defects is to __________.
- A. Train personnel often and thoroughly
- B. Keep a Six Sigma project going on the process at all times
- C. Design defect prevention into the product
- D. Have each process consist of no more than five steps
Answer: C
NEW QUESTION 9
__________Distributions occur when data comes from several sources that are supposed to be the same yet are not.
- A. Skewed
- B. Bimodal
- C. Gaussian
- D. Tri-peaked
Answer: A
NEW QUESTION 10
In the late 1980’s William Smith coined the name Six Sigma for a methodology that had its origins at __________ for quality related work being done there.
- A. Honeywell
- B. Allied Signal
- C. General Electric
- D. Motorola
Answer: D
NEW QUESTION 11
Multiple Linear Regressions (MLR) is best used when which of these are applicable? (Note: There are 3 correct answers).
- A. Non-linear relationships between the inputs X’s and output Y
- B. Uncertainty in the slope of the linear relationship between an X and a Y
- C. Relationships between Y (output) and more than one X (Input)
- D. Preventing the use of a Designed Experiment if unnecessary
- E. We assume that the X’s are independent of each other
Answer: CDE
NEW QUESTION 12
Hypothesis Tests determine the probabilities of differences between observed data and the hypothesis being solely due to chance. This is determined based on the result of the __________.
- A. Random acts
- B. P-values
- C. Standard Deviations
- D. R-values
Answer: B
NEW QUESTION 13
To draw inferences about a sample population being studied by modeling patterns of data in a way that accounts for randomness and uncertainty in the observations is known as __________.
- A. Influential Analysis
- B. Inferential Statistics
- C. Physical Modeling
- D. Sequential Inference
Answer: B
NEW QUESTION 14
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.
- A. True
- B. False
Answer: B
NEW QUESTION 15
Use of the __________ approach is the most classic arrangement when constructing a Fishbone Diagram.
- A. Chronological
- B. 6M
- C. 5M
- D. Alphabetical
Answer: B
NEW QUESTION 16
Which element of waste best describes "the cost of an idle resource"?
- A. Waiting
- B. Motion
- C. Inventory
- D. Correction
Answer: A
NEW QUESTION 17
......